Watch Live :- Chandrayaan-2 Landing on Moon’s Lunar Surface 2019(Link given below)

Chandrayaan-2 is the most complex and prestigious that Isro has ever undertaken for India.It will take a India into the new height in Space Program in the World.If the mission successfully launched it will make India the fourth country after the US, USSR, and China to land on Moon.

ISRO Official link:-https://www.youtube.com/watch?v=7iqNTeZAq-c

Doordarshan Live:-https://www.youtube.com/watch?v=2srV-bEi_DU

Bureau India Link:-https://www.youtube.com/watch?v=lqQe7WsFVQg

Hotstar Live:-https://www.hotstar.com/list/chandrayaan-2-on-hotstar/t-5964

Every Astronaut live:- https://www.youtube.com/watch?feature=youtu.be&v=aQyV2WGmvOs

An artist’s impression of the Chandrayaan 2 orbiter. Image: ISRO

Chandrayaan-2 is India’s second lunar mission.Its has three modules namely Orbiter, Lander (Vikram) & Rover (Pragyan). Orbiter and Lander modules will be interfaced mechanically and stacked together as an integrated module and accommodated inside the GSLV MK-III launch vehicle.

Chandrayaan-2 was launched from the Satish Dhawan Space Centre at Sriharikota

The geosynchronous satellite launch vehicle successfully placed the 3,850-kg Chandrayaan-2 into the earth orbit about 16 minutes later

India is using its most powerful rocket and Geosynchronous Satellite Launch Vehicle Mark III (GSLV Mk-III) in this mission. It weight 640 tonnes (almost 1.5 times the weight of a fully-loaded 747 jumbo jet) and at 44 metres (144ft) is as high as a 14-storey building.

CHANDRAYAAN 2 LIVE:-

Launch is only the beginning of a 384,000km (239,000-mile) journey – the robotic craft is expected to land on the Moon some 54 days later.
A Rover is housed inside the Lander. After launch into earth bound orbit by GSLV MK-III, the integrated module will reach Moon orbit using Orbiter propulsion module. Subsequently, Lander will separate from the Orbiter and soft land at the predetermined site close to the lunar South Pole of the moon,at a latitude of about 70° south. Further, the Rover will roll out for carrying out scientific experiments on the lunar surface. Instruments are also mounted on Lander and Orbiter for carrying out scientific experiments for reseach in Moon Surface.

Launcher and the Spacecraft of Chandrayaan-2:-

Collected images of Chandrayaan-2 :–Moon Landing Mission 2Collected images of Chandrayaan-2 :-Landing of Chandrayaan-2 on Moon’s Lunar SurfaceCollected images of Chandrayaan-2 :–Moon Landing Mission 2Collected images of Chandrayaan-2 :-

Chandrayaan-2 animated vedio concept of landing on moon created by Artist:-

Chandrayaan-2: India space launch delayed by technical problem of Rocket.

An hour before the lift-off,Launch of Chandrayaan-2 was originally scheduled for 14 July 2019 at 21:21 UTC but due to technical snag it was canceled few minutes before launch and a revised date will be announced by Indian Space Research Organisation (ISRO).
The rocket will be taken back for further investigation. The technical team was noticed. They have first to approach the vehicle to assess the problem. First we have to empty the fuel loaded in the rocket, then the rocket will be taken back for further investigation,it can take 10 days for fix the problem, quoting an Isro official.

Chandrayaan2 commenced today at 1843 Hrs IST. The launch is scheduled at 1443 Hrs IST on July 22nd.

Total Page Visits: 21628 - Today Page Visits: 18

Leave a Reply